FTP Site | Careers

Web Market: Military

Project Name: Los Alamitos Readiness Center

General Contractor: Silva/Barnhart Joint Venture

Electrical Value: $2,600,000

Project Description:

This California National Guard project includes construction of three buildings total – (1) two-story main readiness building (169,000 sf) and (2) single story buildings (100,000 sf) total 269,000 The two story building includes offices, kitchen, restrooms, locker rooms, classrooms/library unit storages, weapon vault, emergency operating center, and break rooms.  One single story building houses classrooms while the other is an orderly building with administration offices.
The facilities are mechanically heated, cooled and equipped with automatic sprinkler system. The primary building electrical service is from the existing SCE switch gear, and the building service voltage is 480Y/277V 3-phase, 4-wire system. Voice and data connectivities are provided via single mode fiber optic cabling and copper cabling.
Gould Electric provided site lighting, exterior and interior lighting, electrical systems, low voltage power conductors and cables, underground distribution, raceways, pad mounted transformers, lighting controls, switchboards, cabling, mass notification system, and commissioning.
Site improvement include demolition and site preparation for the construction of the facilities and site amenities including hard- and soft-scape, detention basin, parking lots, site lighting, dry and wet utilities, new roadways, fences, and gates.


Who We Are
Why Us
What We Do
Our Work
In The News
Careers

12975 Brookprinter Place, Suite 280

Poway, CA 92064

Phone: 858-748-2474

Fax: 858-748-2431

2011 Copyright. Gould Electric Inc. All Rights Reserved.