Project Name: Scripps Mercy Hospital

General Contractor: McCarthy Building Companies

Electrical Value: $2,500,000

Project Description:

The Scripps Mercy Hospital Renovation included phase 1 site work for new city street light poles, all underground conduit and substructures (per SDG&E drawings), and power for new brand signage. Additionally, relocation of existing power, lighting, fire alarm, and low voltage was needed. Our BIM department modeled the above ceiling utilities to ensure that phases 2 and 3 proceed smoothly. As with any working hospital, we communicated daily with all project stakeholders—including relevant medical personnel—to ensure that mitigation was up to their specifications.

The project is within budget and on schedule with zero lost workdays or incidents.


Who We Are
Why Us
What We Do
Our Work
In The News
Careers

12975 Brookprinter Place, Suite 280

Poway, CA 92064

Phone: 858-748-2474

Fax: 858-748-2431

2011 Copyright. Gould Electric Inc. All Rights Reserved.